Large-scale circulating fluidized bed boilers, gas boilers, biomass boilers, waste heat boilers for waste, hazardous waste, non-ferrous metals, CDQ and other waste heat boilers, R&D and manufacturer of new intelligent control autoclaves
How to apply for boiler installation, transformation and maintenance license
Home » service support » Boiler knowledge » Boiler knowledge » How to apply for boiler installation, transformation and maintenance license

How to apply for boiler installation, transformation and maintenance license

Views: 1865     Author: Site Editor     Publish Time: 2022-11-24      Origin: Site

The company covers an area of about 170,000 square meters and has more than 700 employees, including more than 200 people with professional and technical titles, and more than 70 people with middle and senior technical titles. We have the manufacturing license of Class A boiler and Class A1 pressure vessel, ASME certification qualification, boiler installation, alteration, repair and maintenance license, and have passed IO9001 quality management system certification, ISO14001 environmental management system certification, ISO45001 occupational health and safety management system certification. Moreover, we has more than 40 technical patents of boiler products.


For enterprises with boiler installation, maintenance and transformation qualification, they can apply to relevant departments for boiler installation, transformation and maintenance license. The application certificate needs to provide Application for Special Equipment Installation, Transformation and Maintenance License (in triplicate), industrial and commercial business license and its copies, quality assurance manual, and license related qualification certificates. The specific application procedures are as follows:

1. Acceptance

The examination and approval authority shall examine and verify the integrity of the material application submitted by the enterprise, and approve the application if it meets the specified requirements; If it does not meet the requirements, the applicant needs to supplement. If it meets the requirements after supplement, it will be accepted. If it fails to submit all the contents within the specified time, it will not be accepted.

2. Trial installation and reconstruction

The accepted application units can be engaged in the trial installation and transformation of boilers within the scope of acceptance, and the period of validity of the trial installation and transformation is generally one year.

3. Qualification review

After the expiration of the trial installation and transformation period, the application unit shall invite the appraisal and review organization to conduct the appraisal and review for the units that are in good repair and have no installation and transformation quality problems or serious liability accidents.

4. Review and issue certificate

The examination and approval authority shall review the appraisal results, and if it is confirmed that the appraisal results are qualified, the applicant shall issue a license according to law.


DHX循环流化床03


The above is Jiangsu Sifang Boiler's answer to this question. If you have any questions about other boiler related issues, please consult Jiangsu Sifang Boiler's online customer service or call 0516-85871846 or 0516-85532705. Jiangsu Sifang Boiler's professional technicians will answer your questions in time.

Integrate high-end technology to create high-quality boilers

Product Center

Quick Links

Services

Contact us
+86 516 85532690
Huarun Industrial Park, Xuzhou Huaihai International Port District, Xuzhou City, Jiangsu Province, China
Whatsapp: +86 19805005735
E-mail: xxb@jssfgl.com
Copyright 2023 Jiangsu Sifang Clean Energy Equipment Manufacturing Co.,Ltd | Sitemap    苏ICP备14011720号-1
Technical Support: Leadong