Views: 0 Author: Site Editor Publish Time: 2022-07-01 Origin: Site
In order to ensure the reliability of each part of the furnace wall of the boiler and long-term use at different temperatures, gradually evaporate the water, and ensure the strength and airtightness of the furnace wall, the newly installed boiler and the newly built furnace wall are naturally cured. , the oven must be carried out.
The oven process is actually two stages, namely the natural drying stage during construction and the heating and baking stage.