Large-scale circulating fluidized bed boilers, gas boilers, biomass boilers, waste heat boilers for waste, hazardous waste, non-ferrous metals, CDQ and other waste heat boilers, R&D and manufacturer of new intelligent control autoclaves
news list
Home » news list
  • Jul
    01
    Oven Precautions
    1. Oven time and temperature control points are different due to different refractory materials and metal heating surface materials. It should be carried out in strict accordance with the heating curve of the oven. The temperature should be raised slowly, and the flame distribution should be uniform.For example, the oven temperature of high-strength wear-resistant castables in a circulating fluidized bed boiler can be referred to as follows: temperature range (℃) rise (decrease) temperature speed (℃/h) required time (h) normal temperature ~ 1505 ~ 1013 ~ 26150± 5024150~31510~1511~16.5315±5036315~54020~257.5~9540±5024540-Normal temperature<25/2. During the oven, the boiler water level should be kept normal, and the expansion of the boiler drum and each header should be monitored and recorded.
  • Jul
    01
    Operation steps of the oven
    1. Turn on the induced draft fan to discharge the gas from the furnace; spread the prepared firewood and base material, with a thickness of about 250 mm, and then ignite it with a torch. At the beginning, the ventilation volume should be small, and the fire should be carried out according to the requirements of the heating curve. Turn on the induced draft fan to make the flue gas flow slowly, increase the rotational speed of the induced draft fan in the middle and late stages, and heat up according to the oven curve.2. Oven standard: based on the moisture content of the brick wall.When the refractory brick mortar moisture content of the furnace wall reaches about 7%, and the red brick mortar reaches 7-10%, it is possible to start the furnace without baking the furnace separately. After the furnace is finished, the moisture content of the furnace wall mortar is below 2.5%. Oven finished.
  • Jul
    01
    The conditions that the oven must have
    1. The boiler body is installed, the furnace wall and insulation work are completed, and the natural maintenance is 5-7 days; 2. The trial operation of each boiler system is completed; 3. The thermal instruments and measuring points required for the oven have been installed and calibrated; 4. Prepare enough fuel for the oven (such as firewood, bottom material, carbon block); 5. Contact the steam turbine personnel to fill the boiler with water to ensure that the water level is at the normal water level.6. After inspection by the testing department, the hydraulic test is qualified.
  • Jul
    01
    Purpose of the oven
    In order to ensure the reliability of each part of the furnace wall of the boiler and long-term use at different temperatures, gradually evaporate the water, and ensure the strength and airtightness of the furnace wall, the newly installed boiler and the newly built furnace wall are naturally cured. , the oven must be carried out.The oven process is actually two stages, namely the natural drying stage during construction and the heating and baking stage.
  • Jun
    22
    Hancheng Thermal Power Co., Ltd. 2x116MW corner tube boiler
    Project address: Hancheng
    Equipment model: DHL116-1.6/130/70-P
  • Jun
    22
    Kunming Xunhechuan Mining Co., Ltd. QCF32.4-1300-23-4.2
    Project address: Kunming
  • Jun
    22
    Xuzhou Hazardous Waste Q6.5-1150-2.6
    Project address: Xuzhou
  • Jun
    22
    Domestic waste incineration waste heat boiler
  • Jun
    22
    Shaanxi Jinghe Thermal Power Co., Ltd.
    Project address: Xi'an, Shaanxi
    Equipment model: DHS 80-1.6/260-Q
  • Jun
    22
    Shanxi Yuncheng 35t/h CFB Boiler / Inner Mongolia 70t/h CFB Boiler
    Project address: Shanxi Yuncheng/Inner Mongolia
    Equipment model: SFG-55-3.82-MX/QXX70-1.6/150/90-H
  • Jun
    22
    Shandong Lianxing Energy Co., Ltd. 26t/h pulverized coal furnace
    Equipment model: SFG-20/5.3-MS
  • Jun
    22
    Shandong Xinfa Group 56 fully automatic hydraulic door open autoclave
  • Total 68 pages  Go to Page
  • Go
Integrate high-end technology to create high-quality boilers

Product Center

Quick Links

Services

Contact us
+86 19851782859
Whatsapp: +86 19805005735
E-mail: xxb@jssfgl.com
Add: Huarun Industrial Park, Xuzhou Huaihai International Port District, Xuzhou City, Jiangsu Province, China
Copyright 2023 Jiangsu Sifang Clean Energy Equipment Manufacturing Co.,Ltd | Sitemap    苏ICP备14011720号-1